Nera OS
EN
Log in Book demo

SOLUTIONS · AEROSPACE

Automated shift reporting for aerospace assembly

Nera’s AI voice assistant talks to every technician each shift, sends shortages and blockers to their owners, and writes the shift and weekly reports

  • Any language on the floor
  • Voice or chat, no training
  • Repeat issues tracked
A technician in safety glasses inspecting an aircraft subassembly in an assembly bay
Nera · 2 min · to Supply chainWiring loom shortage · Station 3Repeat ×2 this week · station blocked 2 h.
Nera · start of shift06:04 · Assembly station 3

Nera Morning Jonas. Anything blocking station 3?

Jonas Still no wiring looms. Second day running, we’re rebuilding jigs to keep going.

Nera Logged as a repeat. I’ve told supply chain and added it to Friday’s report.

spotted on the second day

WHY AEROSPACE PLANTS FEEL IT FIRST

One missing part can stop the whole build

Aerospace builds few units with long assembly times. A blocker that sits for a day moves the delivery date, and the same shortage keeps coming back.

  1. 01

    Shortages that keep coming back

    A missing jig or wiring loom blocks a station for hours, then returns two days later. Nobody sees the pattern until the weekly meeting.

  2. 02

    Long builds, little slack

    Each unit takes days or weeks, so one blocked station moves the whole delivery.

  3. 03

    Status lives in conversations

    What happened at each station is told in person and retyped later, if someone has time.

  4. 04

    Managers chase 30 people for one report

    A supervisor talks to everyone on the shift, then types it all into Excel. The plant director chases them again to check the numbers.

USE CASES

How aerospace plants use Nera every shift

Wiring loom shortage · Station 3→ Supply chain · repeat ×2
No chassis · Station 1→ Planner · until Monday
01 · Catch it early

Shortages reach supply chain in minutes

A technician says what’s missing. Nera tells the right person and marks it as a repeat if it happened before.

Handover · evening→ morning
Station 3 waiting on looms · Supply chain on it
Jig rework done · ready for QA
02 · Hand over

Every shift starts with the open blockers

Nera collects each technician’s update at the end of the shift, so the next shift knows what’s waiting and who owns it.

Assembly jig shortage · 3 times in 3 days · 400+ min downtime
03 · Track repeats

Repeat issues and downtime add up on their own

Nera counts how often each issue returns and how long it blocks a station, so the real cost is visible.

Weekly report · ready Friday
Top issue: wiring looms, 3 stations affected
04 · Report

The weekly report is ready before the meeting

Nera evaluates the week and puts the most impactful problems on top, so the meeting is about fixes.

05 · Your line

Have a different problem on your floor?

Tell us about your use case and we’ll figure out how Nera can fix it.

Share use case

CUSTOMER STORY 

What changed at a precision manufacturing plant in 6 weeks

Book demo

€50k

saved through process optimisation

7 days

of manager time back every month

80 → 8

issues reported per day

Plant director
"For the first time in my career I don't need to force my team to do the reports, neither listen to the same problem from 5 different people"
Plant Director, precision manufacturing plant

Built for the people running the build

Plant directors
One checked picture of every station and shift, without chasing anyone
Quality and compliance
Every issue logged with who reported it, when and who owns it
Shift supervisors
Blockers reach you the moment they happen
Technicians
Report a problem by talking. Nothing to fill in
Plant director, quality and compliance, shift supervisor and technician connected to Nera; every station reports, every owner hears

Live in two weeks, paid only after go-live

Book demo
  1. Week 1

    Free trial for one team

    A 30-minute kickoff and you are set. No charge.

  2. Week 2

    On-site pilot

    We meet every manager and tune Nera to your stations, shifts and quality process.

  3. Week 3

    Go live, billing starts

    Your subscription starts only after a successful rollout.

AEROSPACE

Questions from aerospace plants

Does Nera fit our quality and traceability requirements?

Nera keeps a record of every issue with who reported it, when and who owns it.

Where is our data stored?

In the EU, with an on-premises option. Everyone sees only what their role allows.

Do technicians need to stop work to use it?

A check-in takes about a minute, by voice or chat, at the start and end of the shift.

Can Nera track supplier shortages across stations?

Yes. Repeat shortages are grouped and counted, with the downtime for each station.

How is this different from our MES?

An MES tracks machines and orders. Nera asks people what’s blocking them and writes it down for them.

When do we start paying?

Only after a successful go-live, usually in week 3.

Try Nera with one team
on your floor

Book a 15-minute call. We'll set up a free trial for one team.

free for one team
Book demo

We use cookies that are necessary for this site to work. With your consent, we also use analytics cookies to understand how the site is used. Privacy Policy